Gecama Hybrid

Spain

Gecama Hybrid is a hybridization of the Gecama Wind farm, which utilizes the same interconnection of the original project while producing electricity by another renewable technology, thus allowing much more efficient use of the project's infrastructure (substations and transmission line). The project will consist of 225 MW PV and 200 MWh storage, and will be located within the same polygon of the Wind farm.
Back

Project Features

Project Status
Pre construction
Expected Commercial Operation Date
2025
Installed Capacity
225 MW
Storage Capacity
200 MWh